Thursday, July 09, 2009

More info on Savannah's low cost streetcar


http://www.heritagetrolley.com/planSavannah.htm










http://www.heritagetrolley.com/images/SavannahStreetcarPresentation.pdf

Wednesday, June 24, 2009

Savannah opens trolley line for less than $1Million

20 December 2008

Savannah:
Hybrid "wireless" streetcar line makes debut

Savannah, Georgia — A short, somewhat experimental streetcar tourist line made its debut earlier this month, running along an approximately one-mile (1.6 km) single-track line through a restaurant and tourist district adjacent to the Savannah River. The line serves River Street, a former industrial corridor converted into a more upscale recreational, retail, and restaurant area.

Savannah streetcar The lines's single streetcar (a converted heritage-type car from Melbourne, Australia) was rolled out to participated in Savannah’s Climate Action Parade on River Street on December 9th. On Dec. 13th, the public were invited to take a free test ride on the new line.
[Photo: WSAV-TV]

According to an article in Rail Transit Online (December 2008), the retired Melbourne W5 streetcar, over 70 years old, has been fitted with an on-board biodiesel generator to supply electricity to the traction motors, somewhat similar to the propulsion configuration used on several other lines, such as one in Galveston. Typically, with these kinds of low-cost systems, project managers have sought to avoid the expense and logistical aspects of overhead contact systems (OCS) for supplying power. However, project designers envision eventual conversion to conventional OCS power distribution. According to news reports, the 47-foot-long (14.3-m) car seats about 50 and will accommodate another 50 standing passengers.

The entire project, under the direction of TranSystems, cost about $1 million, including almost $600,000 to buy the right-of-way, $100,000 for engineering and $207,000 for TranSystems to restore the car in Pennsylvania. Rail Transit Online notes that "Savannah has a long history of street railways, with the first horse cars starting operation in 1869 followed in 1890 by electric trolleys. The system closed on Aug. 26, 1946."

The official line opening is scheduled to take place in January.


Tuesday, June 09, 2009

SSLC council resolution in favor of Streetcar

A JOINT RESOLUTION OF THE SALT LAKE CITY COUNCIL AND MAYOR
ADOPTING A LOCALLY PREFERRED ALTERNATIVE FOR THE UTAH
TRANSIT AUTHORITY (UTA) TO EXTEND TRANSIT OPTIONS WITHIN
THE SUGAR HOUSE TRANSIT CORRIDOR
WHEREAS, the Utah Transit Authority (“UTA”) is a public transit district,
which presently owns and operates a high capacity rail fixed guideway system serving
portions of the Salt Lake Valley; and
WHEREAS, this rail fixed guideway system has been a major success with
ridership substantially exceeding pre-construction projections and public sentiment
strongly supporting rapid expansion of high capacity fixed guideway systems; and
WHEREAS, UTA proposes to expand fixed guideway systems to include, among
other things, a 3-mile rail fixed guideway system from the Sugar House community of
Salt Lake City to the City of South Salt Lake, as more particularly described herein (the
“Sugar House Transit Corridor”); and
WHEREAS, UTA purchased an existing railroad right of way within the Sugar
House Transit Corridor from Union Pacific in 2002, anticipating the future need for light
rail transit expansion within Salt Lake City; and
WHEREAS, Salt Lake City’s Sugar House Community Master Plan (adopted
December 13, 2005, Ordinance 89 of 2005) explicitly identifies in its ‘Business District
Goals and Objectives’ the theme of “directing development to be transit and pedestrian
oriented”; and
WHEREAS, the Sugar House Community Master Plan explicitly states in its
‘Multi-modal Priorities’ that future land use patterns in Sugar House should support
the implementation of mass transit throughout the community; and
WHEREAS, the Sugar House Community Master Plan explicitly states support
for the construction of “rail along the Sugar House rail corridor and determine locations
for future transit stations and park and ride facilities within the Sugar House Business
District”; and
WHEREAS, current planning efforts within the Sugar House Transit Corridor
such as the Market Station Development (South Salt Lake) and the Granite Block (Salt
Lake City) development area have anticipated the extension of rail transit along the
existing UTA owned right of way; and
WHEREAS, the Sugar House residential and business communities have
demonstrated interest and grass roots support for a surface rail alternative to improve
mobility and enhance economic opportunities within the area; and
WHEREAS, the expansion of transit alternatives via the UTA right of way in the
Sugar House Transit Corridor has been reviewed and approved as part of the Wasatch
Front Regional Council 2007-2030 Transportation Master Plan, (May 2007); and
WHEREAS, construction and operation of a fixed guideway transit system in the
Sugar House Transit Corridor will reduce reliance on the private automobile, improve air
quality, reduce the growth of vehicle miles traveled, and support the objectives of the
Wasatch Front Regional Council’s Regional Transportation Plan; and
WHEREAS, Salt Lake City and the City of South Salt Lake (the “City
Sponsors”) along with UTA, commissioned a study of public transportation alternatives
within the Sugar House Transit Corridor (the “Alternatives Analysis”); and
WHEREAS, prior to conducting the Alternatives Analysis, the City Sponsors
agreed upon a list of criteria to be considered to help guide the decision to determine the
proper public transportation alternative to operate within the Sugar House Transit
Corridor; and
WHEREAS, the criteria include: (1) the public transit conveyance operating
within the corridor should serve the needs of citizens living and working along the
corridor by promoting “walkable neighborhoods” where citizens can conveniently use
public transit; (2) it should provide stations or boarding platforms at a maximum spacing
of two blocks; (3) it should provide a low-speed system in which vehicles travel at speeds
not to exceed 25 to 30 miles per hour; (4) it should utilize conventional signals at street
and highway crossings that can also accommodate pedestrian crossings; (5) it should use
noise reducing technology; and (6) it should include a landscaped, multi-use trail at least
15-feet-wide throughout the entire corridor to serve as a parkway that increases beauty,
enhances socialization and contributes to the walkable nature of the surrounding
neighborhoods; (7) it should make a complete transit-to-transit connection from the 200
West Station on the North-South TRAX line to other mass transit options, including highfrequency
buses and future transit modes along the 1100 East/Highland Drive and 1300
East Street traffic corridors; and
WHEREAS, the federally required Alternatives Analysis is now complete, and
Salt Lake City has reviewed the Sugar House Transit Corridor Alternatives Study Final
Report, dated January 2008, and finds that it complies with the criteria established by the
City Sponsors and accepts its analysis of impacts, costs, environmental constraints, and
ridership; and
WHEREAS, Salt Lake City Transportation Master Plan Rail Transit Corridors
Map updated in July 2006 identifies the Sugar House area as a potential transit corridor;
and
WHEREAS, the Sugar House line will be a community level streetcar line and
would better serve the transit-friendly Sugar House District, parallel a portion of one of
UTA’s best performing bus routes, and provide an east-west connection with the West
Valley Line and a direct connection to the main north-south light rail line; and
WHEREAS, Salt Lake City understands that more specific environmental issues
will be reviewed, evaluated, and addressed during subsequent design and engineering
phases of the project as well as the final terminus of the line and at that time more
specific mitigation measures related to specific impacts will be determined; and
WHEREAS, Salt Lake City believes that this proposed project best meets the
needs of the City as a whole, and is in the best interest of the public health, safety, and
welfare of the City; and
WHEREAS, at its meeting on Monday 3 December 2007, the Salt Lake City
Transportation Advisory Board approved a motion supporting the findings and
recommendations of the Sugar House Transit Corridor Alternatives Analysis for a
modern rail streetcar along the existing UTA-owned right of way within Salt Lake City
and South Salt Lake City, and
WHEREAS, at its meeting on Wednesday 13 February 2008, the Salt Lake City
Planning Commission approved a motion supporting the findings and recommendations
of the Sugar House Transit Corridor Alternatives Analysis for a modern rail streetcar
along the existing UTA-owned right of way within Salt Lake City and South Salt Lake
City; and
WHEREAS, at its meeting on January 23, 2008, the City Council of South Salt
Lake City approved a motion supporting the findings and recommendations of the Sugar
House Transit Corridor Alternatives Analysis for a modern rail streetcar along the
existing UTA owned right of way within Salt Lake City and South Salt Lake City.
THEREFORE, BE IT RESOLVED by the Salt Lake City Council and Mayor as
follows:
1. Locally Preferred Alternative. That the proposed construction of the rail
fixed guideway system for purposes of operating a modern rail streetcar along the
existing UTA owned right of way within Salt Lake City and South Salt Lake City,
identified in the Sugar House Transit Corridor Alternatives Study Final Report, dated
January 2008, is endorsed and approved by the Salt Lake City Council and Mayor as the
Locally Preferred Alternative.
2. Effective Date. This Resolution shall become effective immediately upon
its passage.

SL Trib 5-29-09

Sugar House streetcar? It may be closer to reality than you think


Click photo to enlarge
Salt Lake City Mayor Ralph Becker talks about a new... (Steve Griffin / The Salt Lake Tribune)

A slow-sliding streetcar connecting Sugar House with TRAX could be ferrying passengers in three years, and the line eventually may swing north to Westminster College and the University of Utah.

In a status update Friday, Salt Lake City Mayor Ralph Becker, South Salt Lake Mayor Bob Gray and Utah Transit Authority board member Keith Bartholomew stood on the corner of McClelland Street and Sugarmont Drive -- the initial end of the line -- to announce the $40 million to $50 million project is "on or ahead of schedule."

The two cities and UTA will spend the next year deciding whether to pursue federal dollars or local funding, followed by a two-year construction timeline. The planned streetcar, stopping every two blocks,

Sugar House streetcar
would run along a two-mile stretch of 2300 South between the Central Pointe TRAX station on 200 West and McClelland at 1045 East. Blueprints call for enough space alongside the streetcar for a pedestrian and bicycle trail.

"We want this to be a valley project," said Gray, predicting the car will salve congestion in Sugar House and South Salt Lake. "Something that will pull the community and entire valley together."

A 2007 study estimated daily ridership on the line at 2,300 people. The construction plan includes a single track -- a streetcar would appear every 15 minutes -- with potential for a double track if demand increases.

UTA completed a preliminary review last year that concluded streetcars, rather than light




rail or historic trolleys, were the best option.

Salt Lake City Councilman Soren Simonsen, who joined the mayors Friday, said the line someday could extend east to neighborhoods hugging the Sugar House business district as well as north to Westminster and the U.

"It will be fantastic," said Scott Clark, who owns a vehicle-detailing and storage shop within earshot of the final stop across from Fairmont Park. "All the Sugar House businesses should benefit."

Bartholomew also told a neighbor who stopped by the news conference on her bicycle that the streetcar's impact on property values would be "substantially positive."

"You might think of this as your alternative 401(k)," he said.

The officials predicted an uptick in commercial development along the line, noting retail density tends to follow streetcars in cities such as San Diego and Portland, Ore. And Bartholomew said the addition could transform the surrounding neighborhoods into "some of the most exciting in the region."

In two weeks, Becker plans to sponsor a resolution at the U.S. Conference of Mayors meeting in Providence, R.I., calling on Congress to streamline the funding process for streetcars nationwide. Rep. Jim Matheson, D-Utah, already has placed a cash request for the Sugar House project.

"We're hoping," Becker said, "that Congress will accelerate the investments."

djensen@sltrib.com

KSL TV

Sugar House and SSL could soon have a streetcar line
May 29th, 2009 @ 3:48pm

SUGAR HOUSE -- It's a blast from the past, but it's now the wave of the future. A streetcar line could run through Sugar House and South Salt Lake in the next few years.

"Streetcars have become really popular among cities, and we are seeing that as a mode of transportation that can serve a lot of our communities in cities across the country," said Salt Lake City Mayor Ralph Becker.

It's like TRAX but different, in that it is a slow-speed transit system and the car makes many more stops. Usually, streetcars run through neighborhoods, giving people easy access to stores and businesses.

The Sugar House Street Car project is a two-mile rail line, running east and west, that would connect the Sugar House area with the TRAX stop in center of the valley. The new line would run along Sugarmont Drive, stopping every two blocks or so.

"This streetcar line will eliminate a lot of the congestion that's going on both in Sugar House and in the South Salt Lake area," explained South Salt Lake Mayor Bob Gray.

Such a system has been studied in Utah for a number of years. This project is a joint effort between Salt Lake and South Salt Lake, along with the Utah Transit Authority, which owns the corridor where the streetcars will run.

The corridor will be pedestrian and bike friendly as well -- Parley's Trail will be extended along the route -- and it could be a reality soon.

Becker says he's sponsoring a resolution two weeks from now at the U.S. Conference of Mayors meeting in Providence, R.I.

"It urges Congress and the federal government to move quickly to invest properly and devote the resources to streamline the decision making for streetcars in the United States," Becker explained.

He continued, "We are really progressing on a rapid pace, and we anticipate -- and this is a rough estimate-- but we really anticipate that if we keep moving along as we have, that within a year we'll be ready with decisions to move forward with the final design and construction of the streetcar line."

Once started, the project could take two years to finish. This community used to have a streetcar, so it's already built for one.

UTA expects the streetcar system could get at least 2,300 riders a day. They believe it will cost $40 million to $50 million to construct.

------

Story compiled with contributions from Mary Richards and Keith McCord.

SL TRIB Editorial- Good Idea just not now

Streetcar desire

Now's not the time for Sugar House

Tribune Editorial


Local officials are gung-ho to build a $40 million streetcar line that would connect Sugar House to the main TRAX line. We like what rail has done and is doing for mass transit in the Salt Lake Valley, but we still have doubts about this project.

The streetcar seems like an obvious thing to do for a couple of reasons. First, the Utah Transit Authority already owns a railroad right of way that runs the two-mile length of the route at about 2300 South. The line would connect to TRAX at the Central Pointe Station just south of 2100 South between 200 West and 300 West. The east terminus would be 1045 E. Sugarmont Dr. (2225 South), in the neighborhood of the former Granite Furniture store.

Second, that right of way, an old freight line that once served the furniture store (remember the jingle "Granite's on the railroad track"?) would accommodate both track for the new trolley and an urban trail for bicycles and walkers. It crosses several major north-south streets, but TRAX has proved that probably would not be a problem.

The new service, described as a modern trolley car, would move relatively slowly on a single track and stop about every two blocks. It would run every 15 minutes during peak service, linking Sugar House, a retail and recreation center (think of Sugar House Park) to the rest of the valley.

It also would relieve automobile traffic on busy 2100 South and encourage further commercial development both along the corridor and in


Advertisement

Sugar House itself.

That all sounds great. But is it worth $40 million? The funding source has not been nailed down.

According to the UTA's own study, capital investment for expanded bus service on 2100 South would cost only $10 million. The streetcar would cost $37 million. Buses are more expensive to operate, but you could run expanded bus service for 26 years on the difference in capital cost between buses and the streetcar.

TRAX has shown that Utahns will ride trains when they won't ride buses. That might be another point in the streetcar's favor, except that Utah doesn't have experience with a slow-moving streetcar system. We would hate for the Sugar House streetcar to turn out to be an expensive failed novelty, especially when UTA is straining to get the remainder of the TRAX and FrontRunner systems built and operating. To our eyes, those are the obvious top priorities, and they will require operating subsidies going forward.

In that context, a Sugar House streetcar seems like a stretch that perhaps should be postponed until the higher-priority projects are up and running for a while.

Saturday, August 02, 2008

First News Article about SH Trolley

This is a copy of the first article that was written about the SH Trolley.

It isn't very favorable
********
Deseret News (Salt Lake City) > May 16, 2003 > Article > Print friendly

Man dreams of Sugar House trolley

Stephen SpeckmanDeseret News staff writer

If one man has his way, vegetable oil commonly used in the kitchen could one day help power a trolley between the 2100 South TRAX light- rail station and Sugar House. To some, however, it's just wishful thinking.

Salt Lake City resident Doug White wants to buy at least two 1950s- era German hybrid rail trolleys for $60,000 each from a railroad company, ship the cars from Berlin and run them through the Utah Transit Authority's 1.8-mile rail corridor between about 250 West and 1100 East.

The 56-person capacity German cars would run two-thirds cleaner than a typical diesel-powered trolley -- and without sulfur emissions, he said. Although, at about eight miles per gallon of vegetable oil, it's not the most fuel-efficient ride.

White made his pitch recently to the Sugar House Community Council.

Critics, including the Utah Transit Authority, are already saying that safety, liability and overall logistics issues make the plan almost impossible to implement.

Community Council chairwoman Helen Peters called it a "romantic" idea, one that needs some fuel of its own.

"I think that there are a lot of challenges to work through, especially with no venture capital," she said.

White's plan is to form a nonprofit company, Sugar House Trolley, and raise the $2 million he thinks it will take to get the project up and running. Some track would need to be added and existing tracks would need to be retrofitted. Several new crossing arms would be needed at each intersection on the route.

UTA general manager John Inglish said White is "way off the mark" in terms of start-up costs and that for a variety of reasons, the idea is "just not realistic." Getting across State and 700 East are just two major challenges.

"He's thinking of a world gone by when you could have done this. . . but not this day and age," Inglish said.

Regulations imposed by the Public Service Commission could further complicate things for White.

There are currently no plans to bring light rail into Sugar House before 2030. Efforts are under way right now just to get Sugar House on the Wasatch Front Regional Council's 2030 plan for future transit projects. Several planned or proposed rail and road projects throughout Utah are already in line for finite federal funds.

White said that if the $2 million in donations he needs for his trolley system were to show up tomorrow, he says he can get the cars running in seven months.

"It's not going to be a huge operation," said White, who works for a satellite TV company. "It's going to be a functional commuter (service) with tourist appeal."

Union Pacific "threw in" the Sugar House corridor as part of UTA's deal last year to purchase 175 miles of right-of-way. Getting light rail in that corridor, Inglish said, is less of a priority than maybe a trail system in the same area.

"Even that has its difficulties," he said.

Mike Allegra, UTA's director of transit development, said he encourages people coming up with ideas for use of alternative technologies in transit. Already, UTA is using new fuel-efficient, environmentally friendly diesel/electric hybrid buses in its fleet.

A Sugar House trolley, White said, would be slower than TRAX light rail but would have more stops on its route and therefore better serve the community. He has set up an e-mail address, sugarhousetrolley@yahoo.com, to gather public comment.

E-mail: sspeckman@desnews.com

Copyright C 2003 Deseret News Publishing Co.

Friday, July 25, 2008

Jan 23 , 2008 SSL city council favors streetcar

1. A resolution of the City of South Salt Lake City Council adopting a locally preferred alternative for the Utah Transit Authority (UTA) to extend transit options within the Sugar House Transit Corridor. Mr. Carlson explained that South Salt Lake and Salt Lake City discussed that it might be to their mutual advantage if they could restore some kind of public transportation system within the Sugar House Spur with all the development that’s occurring in the Sugar House area and the Market Station development in South Salt Lake. Neither was excited about light rail because it goes through a community but does not serve a community. So they looked for a mode of transportation that would utilize the Sugar House Spur and provide a benefit to the communities along the way. The mode of transportation the two cities agreed on were as follows: a mode of transportation that operated at a slow speed, that made frequent stops so the people in the community could use it, that would accommodate an urban linear park (Parley’s Trail), that there would be safe and standardized pedestrian crossings, would require broad local support, different funding options and would promote transit to transit connections. We envision it connecting with the north/south TRAX lines and connecting with north/south bus routes and transportation routes in the Sugar House area. They approached UTA with this idea. UTA has been very supportive of the project. The City Councils of Salt Lake and South Salt Lake entered into an interlocal agreement to do an alternative analysis to study the issue of whether a new mode of public transportation is needed between South Salt Lake and Sugarhouse, what would be the preferred alignment for that mode of transportation and what kind of conveyance would be most appropriate. Fehr and Peers has conducted a thorough study. The public process has been quite intensive. We’ve had stake holder committees that have represented a lot of the interests, the cities, and community members. What Fehr and Peers have concluded is that the potential for rider ship between South Salt Lake and Sugar House does warrant public investment in a public transportation system.

They have concluded that the preferable alternate is to use the existing Sugar House Spur Corridor. They also concluded that the preferred mode of conveyance is a modern street car. It operates at grade level so there’s no platform necessary for boarding. It’s easier for people with wheelchairs, strollers and bicycles. It generally moves at 30 miles per hour. It is much more suited to the criteria the cities established. If the Council passes this resolution it signals that the City of South Salt Lake supports the conclusions the engineers reached in this study and becomes another stepping stone toward getting federal funding to complete the project. The next step is to do an environmental impact statement which will look at the impacts a street car system would have on the neighborhoods through which it passes. The City will have to come up with some more funding for the environmental impact statement.

There was some discussion among the Council on which type of conveyance would be best for the area, a bus rapid transit system or a modern street car.

After discussion Council Member Weaver moved to approve the resolution adopting the locally preferred alternative for the Utah Transit Authority to extend transit options within the Sugar House Spur.

MOTION: John Weaver
SECOND: LeRoy Turner
Roll Call Vote:
Brusch Aye
Fitts Aye
Goddard Aye
Rutter Nay
Siwik Aye
Turner Aye
Weaver Aye

SLC Council votes for SH Trolley

Salt Lake Trib

Sugar House
Council votes 5-0 to run streetcar along 2300 South
The Salt Lake Tribune
Article Last Updated: 07/24/2008 12:37:03 AM MDT
In a 5-0 vote, the City Council adopted a joint resolution with Mayor Ralph Becker to forge ahead with a low-speed Sugar House streetcar to be funded by the capital, Utah Transit Authority and South Salt Lake. After an environmental study, the plan calls for a streetcar to run along a two-mile stretch of 2300 South between UTA's Central Pointe station on 200 West and Highland Drive's Granite Block development. The public trolley will stop every two blocks. The city plans to preserve enough space alongside the street car for a pedestrian and bicycle trail. "I don't anticipate this will change bus service along 2100 South," Councilman Soren Simonsen said. -
Derek P. Jensen

Sunday, June 01, 2008

KCPW , 22 May 2008

Becker Meets With Transportation Officials in Washington

May 22, 2008 by Jeff Robinson

(KCPW News) This week, Salt Lake City Mayor Ralph Becker met with top government transportation officials in Washington, DC, in his effort to get federal funding for the airport TRAX line and a proposed Sugar House trolley line. The mayor said it was a great opportunity to show federal officials that Salt Lake City is on the leading edge of public transit.

"It was a real opportunity for Salt Lake and for Utah to talk about what we're doing with our transit service," said Becker. "We live here, we don't always see this, but it's really groundbreaking nationally; the investment we're making in rail, the improvements we're making all up and down the Wasatch Front."

The mayor said he got good feedback but noted that it will take a lot of time before federal funding comes through. He spoke with officials at the U.S. Department of Transportation, the Federal Transit Administration, and a House subcommittee on transportation.

Saturday, May 31, 2008

KCPW April 2008

logo_npr-pri-bbc

Sugar House Trolley Project On the Move

Apr 03, 2008 by Elizabeth Ziegler

(KCPW News) Salt Lake City Mayor Ralph Becker's campaign promise to bring trolleys back to Sugar House could move closer to reality next week. Becker says a study conducted over the winter determined a trolley line is the best transit solution for the neighborhood.

"We are moving ahead very, very aggressively to get that line, finish studies on that line and to move into construction," Becker says.

The $40 million project is more affordable than extending TRAX to Sugar House, he says. And trolleys travel at slower speeds and make more stops than light-rail, he says. The trolleys would use an existing rail corridor that skirts the South Salt Lake City boundary, at roughly 2100 South, and connects to the North-South TRAX Line at State Street.

"That corridor serves a lot of people, both in South Salt Lake City and in Sugarhouse. It would help relieve congestion. And the more people we have in transit, the more we are helping improve air quality and the long-range issue with climate change," Becker says.

The city's Redevelopment Agency will decide April 8 whether to fund a portion of the environmental impact study for the project. The request asks the RDA to contribute between $33,000 and $100,000 for the study. The other partners in the project, the UTA and South Salt Lake City, have each agreed to pay a third of the $300,000 study.

Posted in KCPW Newsroom. Copyright 2008 KCPW

Valley Journal April 2008

Mayor requests funding
for Sugar House
trolley line
By David Jensen
In the wake of a favorable public response to constructing a trolley
line around Sugar House and South Salt Lake, Mayor Ralph Becker is
submitting an application for a $1 million federal grant for planning and
start-up of the line.
The cost of the entire trolley line project is estimated to be
around $36 million. Becker hopes the initial $1 million will be funded
by the Federal Transit Administrationʼs discretionary New Starts
program. This program is a prelude to actual construction of the line
and has three phases: an alternatives analysis study, a preliminary
engineering study and a fi nal design phase.
The alternatives analysis was completed last October to help determine
transportation alternative to automobile traffi c through the area. This phase
when local decision makers decided on a preferred alternative. The results
included public input, revealed that a trolley line was the most popular and
Proponents agreed that a trolley line would be more neighborhood-oriented and
the Sugar House area.
engineering study involves estimates of project costs, benefi ts and impacts. This
environmental impact statement to certify that there will be no adverse environmental
fi nal design process where design specifi cations and construction plans are
tra
d w
h i
one
he
nee
nvir
ronmental effects.
The third phase is the final
a public
was completed
of this study, which
feasible option. Propo
match the character of th
The preliminary engin
phase includes fi ling an en
effects
Sugar House may enjoy the clang, clang of the
trolley in the not-too-distant future.
File photo.
Continued page 16 “Trolley”

Desnews May 2008

A desire named 'street car'

Deseret News editorial
Published: May 18, 2008
Say "street car" and people think of the Tennessee Williams play or picture San Francisco's little cable cars "climbing halfway to the stars" — spewing Rice-A-Roni into the air as they go along.

In other words, there's something antiquated and charming in the notion of street cars. We miss them the way we fondly remember passenger trains.

Now, Salt Lake City, Ogden and other cities around the West are hoping to climb back on board again with street car systems.

In his recent budget, Salt Lake City Mayor Ralph Becker said he was setting aside $100,000 so the city could partner with South Salt Lake and the Utah Transit Authority to get things rolling for Sugar House street cars. He said he didn't know the final form of the thing — it might even be quaint and antique — though chances are it would look more like the sleek, modernistic versions found in Miami and Birmingham, Ala. When told the city already had the historical Trolley Square where the things could be housed, Becker mused that driving the things 20 blocks out of the way might be asking a bit too much.

Still, as Utahns cut back on buying gas (consumption is down 20 percent), it means other ways of getting around must come into high relief. And street cars seem to fill the bill.

In a nation where everything old tends to become new again, the idea of street cars moving about the city streets sounds both historic and futuristic at the same time — which isn't a bad motto for city planners to follow.

The appeal of the cars is they are lighter and share the road with cars. They are energy-efficient. And the street cars have a positive image in the minds of shoppers, retailers and city leaders. They feel "human friendly." At last count, more than two dozen American cities had installed them.

And so far, the track record for street cars is impressive. According to USA Today, Little Rock's trolleys have been so successful that an expansion was called for. Portland's Pearl District is now known for its street cars. And in Tucson, the street cars are now a part of local lore Old Town.

In short, now is a good time for Utah to join the trend.

Tuesday, December 18, 2007

Thanks and Good Bye

The SugarHouse Trolley Association is now history.
It has been a fun 7 years of meeting with the community to add some great benefits to our community.
I was a lighting rod that attracted alot of interest both positive and negative for the idea of Trolley to connect SSL to SugarHouse.

D.

Monday, November 19, 2007

SugarHouse Transit Alternatives Study

The latest I have heard is that the Engineering Firm, Fehr & Peers, has completed its work on the study. At some point it will be formally presented to the 2 city councils of Salt Lake and South Salt Lake. They will review it and then choose the official "Locally Preferred Alternative (LPA)".
They may choose the streetcar/trolley option or might select something entirely different.

Friday, October 26, 2007

Streetcar/Trolley is the Locally Preferred Alternative

Valley Journal October 2007
UTA looking at improved transit in South Salt Lake


By Josh McFadden
Some big transportation changes
could soon be coming to South Salt
Lake, and residents will have influence
over what eventually happens.
The Utah Transit Authority is conducting
a traffic study along the Sugar
House corridor, the area between 1700
South and I-80 and from the TRAX line
to 1300 East. UTA is considering a number
of options to relieve traffic congestion
and has given local residents opportunities
to voice their feelings.
“There are plans for growth and population
here,” said G.J. Labonty, project
manager with Fehr and Peers, a consulting
firm that is conducting the study for
UTA. “We won’t do this against the will
of the people. This has been an open

process. We want to come to reasonable
conclusions.”
In April, UTA held an open house at
the Columbus Center. The three-hour
session showed visitors what the traffic
study would entail, what the existing
conditions along the corridor looked like
and what changes UTA was considering.
A second open house was held in Sugar
House on July 12.
Visitors to the open houses responded
to what forms of transit they would
most prefer to see in the corridor. UTA
is considering a bus rapid transit service,
a system where buses would operate at
lower speeds with greater frequency.
These busses would also drive in a rightof-
way lane. A second option is expanding
routes along 2100 South. Other al

alternatives
include a streetcar/trolley line
in the corridor and an additional TRAX
line. Of the four options, the trolley line
would be the most costly at $36.7 million.
The 2100 South bus line would be
the cheapest, with a construction cost of
$9.8 million.
At a September South Salt Lake City
Council meeting, Labonty presented the
results from the open houses.
“The locally preferred alternative
is a streetcar,” he said. “People like the
lower speeds. This is a very localized
corridor. The community is established
and compact. The people don’t want to
be disrupted.”
Even with the higher building costs,
not to mention the annual maintenance
costs of $1.6 million, 71 percent of the
open house respondents said they wanted
the streetcar/trolley system.
The traffic study began in January
and is expected to continue through the
end of autumn. Whatever changes are
selected, Labonty said it will be in the
best interest of the public and those that
use the corridor the most.
“UTA is supportive of this alignment,”
he said. “More people have vested
interests. What we’re about is commuters
and students.”

Tuesday, October 09, 2007

South Salt Lakers favor streetcar link

By Cathy McKitrick The Salt Lake Tribune
Article Last Updated:09/27/2007 01:23:47 AM MDT


SOUTH SALT LAKE - A modern streetcar system - which would cost $36 million to build - emerged as the local favorite to traverse the east-west corridor connecting this central Salt Lake Valley city to the popular east-side Sugar House commercial district. And the old rail line formerly used to haul freight along 2250 South - the Utah Transit Authority now owns that 2-mile right-of-way - got best marks as the preferred route for the streetcars. Such were the preliminary findings of an alternatives analysis study conducted for UTA by Fehr and Peers, a transportation consulting firm with offices in California, Salt Lake City and Denver. At Wednesday's South Salt Lake City Council session, UTA Project Manager GJ LaBonty presented the locally preferred alternative, selected through an extended public process where many options were considered, including light-rail, streetcar, rapid bus and vintage trolleys. "We're here tonight to tell you what we came up with," LaBonty said. "Streetcar and trolley were highly favored and met most of the needs." At the urging of community leaders in South Salt Lake and Salt Lake City, UTA pursued the study in hopes of tapping federal funds to help construct the project. Early on, stakeholders from the two cities outlined the corridor's transit needs: slow speeds, frequent stops, walkability, an urban linear park, creative funding, broad community support and integration with the larger area transit system. Response from two well-attended open houses conveyed public opposition to light-rail because of its faster speeds and fewer stops. Residents also objected to diesel-powered vehicles traveling through their backyards, LaBonty said. The often-congested, narrow 2100 South - which currently serves as a UTA bus route - also failed to meet the study's criteria in terms of pedestrian orientation and room for expansion, LaBonty said. But some in attendance Wednesday spoke out against the study's recommendations. "We were told it would be a rubber-tire mode on asphalt and now it's a metal wheel on rail," said Dick Stucki, who owns property next to the old rail line. Stucki asked the council to consider installing sound walls to preserve the peace and quiet of the neighborhood. Councilman Mike Rutter extolled the virtues of Bus Rapid Transit (BRT), which would cost only about $18 million to build. "I was very impressed by the rubber-tire system in Eugene [Oregon]," Rutter said, adding he had recently seen it first-hand. Council members voted to delay endorsing UTA's locally preferred alternative until the final draft of the study comes out next month. The Salt Lake City Council will need to sign on as well. If a mass-transit project has City Council support, it stands a better chance to compete for federal dollars, said David Carlson, city attorney for South Salt Lake. cmckitrick@sltrib.com * For more information, visit UTA's Web site: www.rideuta.com/projects/sugarhouseTransitStudy

Monday, August 13, 2007

New Trolley Story

August 2007 Valley Journal/ SugarHouse Edition




Clang, clang, clang, goes the Trolley?



By Fred Thaller
The Sugar House Trolley Association,
a private, non-profi t group originally organized
by Doug White, has spent the last
three years trying to get a trolley approved
for Sugar House and South Salt Lake.
The group proposes to use Utah Transit
Authority’s Sugar House spur to operate a
Heritage Rail Tramway (old-fashioned trolley),
which would blend commuter service
and tourism. The trolley would run from
the 2100 South TRAX station in South Salt
Lake to the East Sugar House area.
White has spent the past seven years
on the project. Right now, he wears all the
hats, but he has volunteers who help him
part-time.
“Civil engineering students at the University
of Utah did the preliminary engineering
reports and feasibility study,” White
said. “And Westminster College business
students wrote the business plan.”
An old-fashioned trolley would match
the character and fl avor of the Sugar
House area, said White. “The well-known
McKinley Avenue Trolley in Dallas, Texas,
operates under that same structure. And it

has proven to be very popular and very
successful. It runs pretty much 24/7 in the
business district.”
He wants his non-profi t group to operate
the trolley in a partnership with UTA,
Salt Lake City and South Salt Lake, who
have commissioned a study on transportation
alternatives for the Sugar House transit
corridor: the area between 1700 South
and I-80, and from the TRAX station at
250 West to 1300 East.
“I have made arrangements with an
owner of a fully operational trolley to rent
his trolley for $1 per year,” White said. “I
just need to raise the $20,000 to $25,000
needed to ship it and its support equipment
to Utah.”
The old rail line right of way at 2250
South only extends to about 1100 East, so
the fi rst phase of the trolley project would
end there.
UTA, Salt Lake City and South Salt
Lake have sponsored several public meetings
to discuss transportation options for
the area. Information from those meetings
was used to develop a short list of three
preferred alternatives which were present-


ed for public consideration at a July 12
open house at the Sprague Library. The
preferred alternatives include TRAX,
street car or trolley and Bus Rapid
Transit.
The transportation study by Fehr
and Peers aims to identify the best route
and vehicle to move people between the
TRAX light-rail station on the west to
the Sugar House commercial district on
the east.
“Trolley and TRAX were head and
shoulders [in popularity] above the other
modes we’ve looked at,” said project
manager Robin Hutcheson.
“We’ve developed goals from what
we’ve heard so far, to provide a neighborhood
and pedestrian-friendly option for
those who live in the area, one connected
to regional modes of transit,” he said.
Part of the study is to fi nd funding
alternatives, according to UTA spokesman
Chad Saley. “We currently have
money for the study but no funding for
the project.”
UTA offi cials expect to have a locally
preferred alternative by September.

Sunday, April 29, 2007

Trolley in Salt Lake Tribune, Apr 26, 07

Salt Lake Tribune
South Salt Lake
East-west transit study due by early fall
The aim is to connect a light-rail station with the Sugar House commercial district
By Cathy McKitrick
The Salt Lake Tribune

Salt Lake Tribune

Article Last Updated:04/26/2007 01:04:50 AM MDT
SOUTH SALT LAKE - An east-west transit corridor study is about one-third done, a transportation consultant told members of the City Council on Wednesday.
The study, begun in February by Salt Lake City-based Fehr and Peers, aims to identify the best route and vehicle to move people between this city's light-rail station on the west to the Sugar House commercial district on the east.
That goal should be met by September, said Fehr and Peers Project Manager Robin Hutcheson.
South Salt Lake and Salt Lake City approached the Utah Transit Authority, requesting such a study be done. "That's unusual," said Hutcheson, noting the drive for the study came from the bottom up.
UTA currently owns a right of way along the old Union Pacific rail line at 2250 South. Area trail enthusiasts envision a linear park and asphalt trail running alongside the transit corridor.
To receive federal funding, the study must consider other route options as well as UTA's right of way. Hutcheson said the study encompasses the area between 1700 South and 2700 South, and the TRAX station at 250 W. 2100 South, eastward to 1300 East.
"We're also looking at build and no-build options," Hutcheson said, meaning the route options could be dismissed in favor of existing services.
UTA's bus No. 30 already services an east-west route along 2100 South, but trail and trolley enthusiasts, along with redevelopment proponents, hope for a people-mover with more appeal.
In early April, the firm held its first open house on the issue. About 80 people attended, Hutcheson said.
Of that group, 45 supported adding a new east-west transit option while seven were against it.
"Trolley and TRAX were head and shoulders above the other modes," Hutcheson said. A rapid bus, streetcars and, yes - even gondolas - are among other alternatives getting a look.
As far as route, 18 preferred the UTA right of way, seven favored 2100 South, which is becoming increasingly congested.
There was broad support for the rail-trail, noted Hutcheson.
"We've developed goals from what we've heard so far, to provide a neighborhood and pedestrian friendly option for those who live in the area, then, beyond that, a connection to regional modes of transit," Hutcheson said.
Councilman Bill Anderson asked how much weight public input actually carries, especially when UTA already owns a right of way.
"We won't build something the community doesn't want," said Mick Crandall, UTA deputy chief of planning and programming
The next open house is scheduled for July 22.
cmckitrick@slrib.com